Home Contact Partners Site Map
Infrastructure and Energy
Slovene Gas Supply Network
Tunnel Equipment
Pumping Stations and Sewage Systems
Water Treatment Plants
Landfill Sites
Industry
Industrial Facilities
Warehouses and Tank Terminals for Loading and Unloading of Petroleum Products, Solvents, Acids and Other Dangerous Substances
Building Complexes
Shopping Complexes, Logistics Facilities and Administration Buildings
Office Buildings
Tourist Facilities and Public Buildings
Fire Protection
Automatic Fire Extinguishing Systems Using Water, Foam or Gas
Environmental Protection
Waste Gases Purification
Cogeneration of Thermal and Electric Power
Savings in Process Water Consumption
Studies and Design
Studies and Analyses
Projektiranje

DESIGN

Reconstruction of Petroleum Products Warehouse, Petrol, Zalog
Preparation of a conceptual study and design documents for twelve underground tanks, two tank truck unloading stations, two loading bays with six loading lines, and a barrel loading station with six lines.

Donit Tesnit, Medvode
Preparation of a conceptual study and design documents for recovery of heat from production, economical cooling water consumption, utilisation of condensation heat for heating with an output of approx. 2 MW, and for lower cooling water consumption.

Liquid Cargo Terminal in the Port of Koper – Tank Truck Loading
Station

Preparation of a conceptual study and complete design documents for phosphoric acid heating and diluting technology including a metering and mixing unit with a capacity of 60 m3/h. Input acid concentration is 93%, output acid concentration ranges from 20 to 93%. The plant covers: a containerised boiler plant, heating coils for storage tanks 2x 1,000m3, a heat exchanger, metering lines, an in-line mixer, an acid cooling unit, heated and insulated phosphoric acid connecting piping, and a
centralised monitoring and control system.

Gas Supply Network in the Town of Idrija
Preparation of a conceptual study and design documents for gas supply network covering 1,500 gas connections in the total length of 16 km.

Incom, Ajdovščina - Steam Boiler Plant
Preparation of design documents for the boiler plant with a capacity of 1,500 kg/h, 10 bar.

Incom, Ajdovščina – Liquified Nitrogen Installation
Preparation of design documents for the liquefied nitrogen installation in the factory warehouse with an area of 30 m3 and temperature of -180°C. Distribution piping to consumers consists of vacuum insulated pipes.

 
   

Experts of the IMP Group have until now designed hundreds of various projects, from infrastructure buildings to large shopping complexes.